Skip to main content

What should be consided when installing a new mounting adapter?

The installation should be carried out by more or less experienced specialists.
The vertical stabilizer is the most suitable installation location as it offers a good compromise in terms of airflow and ground handling.
For optimal operation we recommend installing the adapter hose connectors upwards (function as a siphon), the horizontal orientation parallel to the longitudinal zero axis and the use of hard-walled pipes in the fuselage till under the seat pan. The TE pressure connection should be split here and the connection from this point to the instruments should be done using 8/4mm silicone tubes.

Scheme of a Mounting Adapter installed into a vertical stabilizer
Scheme of a Mounting Adapter installed into a vertical stabilizer

Need assistance?

We are happy to assist.

Close

Can We Help?

We could not send your inquiry.Please make sure all required fields are populated and your information is correct.

Required fields are marked with an *.

Drag & Drop Files